The big first floor weekend came to a close tonight, the joists have been screwed into the joist hangers, water pipes have been redirected, some of the subfloor sheets glued and screwed. Above, Jen and Joe admired their day's labor, standing on a new level floor. Stan enjoyed the first lunch ever in the new dining room (right), dangling his legs through the joists and eating off the new floor. He'll return to Dundas later this week to glue down the rest of the subfloor. Joe heads home and Jennifer goes back to work after a very productive 10 days on her fixer-upper.