Tuesday, March 31, 2015

Kitchen rough-in


Travis will be here tomorrow, so the rush was on to get the counter-tops in place, along with the 20 amp circuits, hot and cold, and drain. Travis will make the actual connections, assuring a professional finish to the amateurs lash up.
Above is the pony wall with the upper mini-counter in place, and two outlets. Below, the purple, mold resistant wallboard will be covered with a tile backsplash when the sink and the countertop are in place.
Tomorrow: The Kitchen Sink.