Like clockwork, the first load of cement showed up, as promised, at 1 p.m. By 3 p.m., our apron and sidewalk was poured, troweled and a brush finish applied.
The project will be entirely finished by this time tomorrow, we're told. And so far, everything we've been told has happened.
"It's Miller Time." a mason said to the observer as he cleaned his tools. Really, he actually said that.