Monday, February 23, 2015

French Curve overhead trellis project -- Day Two

It's about 14 feet long.
The first laminated redwood assembly has been glued, screwed, jig-sawed and sanded. This finished rail will now be used as a template, and placed on top of a second rail assembly and, before its final trim, traced to assure that the twin curves will be an exact match. Duplicate rough pieces for the second rail were pre-cut and set aside on the first day, so final assembly of the second rail should go much quicker. Which is a good thing. Stan leaves for Minneapolis on Wednesday morning.