Master plumbers will arrive mid-morning to rough-in the washer and dryer connections so that we can reorganize our mud room into a more functional space.
Barry and his brother will do the honors, a complicated re-arrangement of pipes and ducts. Stan pulled the cabinets and opened the floor and walls for their convenience. They will move hot and cold water, the dryer vent, the floor drain and roof vent as well as the gas connection. The 20 amp electrical is already in.
Functional space can be a lot of work. Barry says they'll be done this afternoon and ready for the inspector. (The official one from the city.)
So far. . .
Drain to the basement, stack through the attic 12:15 p.m. |